PCC helped a client in recycling their industrial wastewater. In the recycling plant, ETP effluent from the secondary clarifier has been routed to the RO unit through a set of pretreatment steps, the most important of which is ultrafiltration. The residual dissolved organic matter is thereafter removed in the downstream GAC adsorption filter, which further serves to dechlorinate the water to prevent the downstream membranes from damage through oxidation. The final pretreatment step for the RO is the 1 micron cartridge filter.
Additional project features:
Concentrate recirculation to boost RO system recovery
Use of balance RO concentrate for UF and media filters backwash
Mini-CIP instead of CEB to reduce water and chemicals consumption and costs.
#project #water #recycling #effluenttreatmentplant
Your Email address will not be published
Karachi Office:
Suite No. 223, Anum Blessings K.C.H.S.
Block No. 7/8 Shahrah-e-Faisal,
Karachi – 75350
Office Telephone : +92-21-34556313, 34555543
Fax : +92-21-34559696
Lahore Office: Suite No. 6, 3rd Floor Saleem Plaza, Q Block, Model Town Extension Lahore
Phone: +92-42-35444927
Email: info@primechemicalscorp.com
Mon-Sat: 9am to 6pm